FCC Construcción

18-May-2012 06:53:54
Madrid 20º
Barcelona 17º
Wien 2º
Salzburg 3º

2007

Search
Fecha
From: / /
To: / /
20/11/2007

FCC Construccion awarded section VI of the supply from the Cenajo reservoir to the MC Taibilla Murcia

Aguas de la Cuenca del  Segura has awarded FCC Construcción a  section of the trunk branch between the Altiplano junction and the connection  with the Campotejar waste water treatment plan for €42.3 million.


The total length is 34,755   m using helical welded steel pipes with outer diameters  of 1,720 and 1,320 mm.  It includes three power recovery stations of 1, 1.6 and 2.6 MW.


  • xhtml
  • css 2.1
  • wai AA

Last update: 09/05/2012